Lots of work has gone into the new build.

This build has been going on now for a couple of years, we’re so close now. Here you can see the round wood frame with all the wall and roof studs in place this was early 2022.

We got a load of plywood for the roof and fixed it in place.

It’s starting to look like a building. All the roof ply is up and a membrane is in place until we get the tin to cover it.

The fiddly bits around the round wood timber and all the angles.

The Tin for the roof was donated by Owen Fabrication who run a steel business across the road, they always help us out when we need something big moving or have steel needs. It was so hot on the roof, the sun was beating down and then shining back up at me from the tin.

Insulation going in, all the back boxes and cable for sockets are in place.

doors are in.

My dad came over to join the building fun, we were putting plasterboard up that day. Pretty much everything else has been done by Paul, Mike and Me.

Previous
Previous

The New bakery is nearly there!

Next
Next

Building the new bakery.